2017λ…„ 10μ›” 13일

New infrastructure developments in Tibet


Quoting from the TAR’s transportation department, Kangba TVreported: “except Songduo Tunnel and Milashan Tunnel, Lhasa-Nyingchi High Grade Highway has been well prepared and begins trial operation from October 1.”

The four-lane Lhasa-Nyingchi High Grade Highway is 398 km long; it is designed for a 80 km/h speeed.

λŒ“κΈ€ μ—†μŒ: